Project Introduction

Xi'an-Chengdu Passenger Dedicated Line No. 3 bid is newly constructed. The main line scope mileage is DK401+146~DK431+660 with total length of 30.295km. Main projects of the main line include 21 bridges as long as 10.382km, which accounts for 34.3% of the bid section length, 13 tunnels as long as 15.002km, which accounts for 49.5% of the bid section length, 28 interval roadbeds and one station (Jianguanmen Station) as long as 4.911km, which accounts for 16.2% of the bid section length. Main line starts from Fanjiagou Tunnel DK401+146 in Baolun Town of Guangyuan, which passes through Bailongjiang, Qingjianghe and Jianmenguan Stations and is ended in Shitizi Medium Bridge of Guangyuan DK431+660. Railway grade: passenger dedicated line; main line quantity: double lines;


Applied product

TK-PC high-efficiency water reducer

 Case Show

Xi'an-Chengdu Passenger Dedicated Line Mao County Tunnel No. 1 Inclined Shaft


Xi'an-Chengdu Passenger Dedicated Line Hu County Beam Fabrication Yard